Tuesday, July 31, 2012

Catching Up- July Edition


Musical Trunks
We went to the annual turnover sale in the town where we used to live, and my 7 year old was completely taken by this trunk (along with a plastic snowboard!)
 He said it was "like a REAL treasure chest".  At only $5, I couldn't deny him!
It was almost completely black with caked on dirt,
but we scrubbed it up when we got home.

It's definitely rough, but I love the little details like the fancy hardware!




It's now loaded with pirate, astronaut, & superhero costumes.




Meanwhile, my younger son has staked his claim on the trunk that used to be here... he got rather indignant when I said we'd use it down in the back porch to hide shoes away.  So, now I've got to juggle his room around to find a place for it (who am I kidding- I love this!).


Table updated
We had purchased this little table last November at a yard sale for just $1!!!

At the time, I couldn't decide if I should paint it, because the image on the top was kind of charming.
So I lived with it for a while, and found the stains were really getting to me.










A little spray paint- and it's a whole new table!  I was thinking about doing a stencil on top, and might do that in the future.  But for now I like being able to stick a place mat on it and easily swap it out.







It's going to look really cute outside- the weather didn't cooperate this weekend for photos though!








Egg Report
We're now getting 8 eggs a day! 

See the two giant eggs?!?  
We get them several times a week with double yolks inside.  Mike's friend told him it's good luck... we'll take it :)

There was a little issue where one chicken had started laying them in a hidden area above the nesting boxes... one day I heard her clucking in there, looked & found 12 eggs back there  (in the trash they went!!!)  Mike put some chicken wire across the opening where she was getting in, so now we're all set!

Monday, July 30, 2012

Matching Mouldings

The door & window trim in the bathroom didn't match the rest of the house.  I'm sure this is because the bathroom was added at a later date.  We wanted to tie it back in, so started looking around for as close as we could get to this:
rosettes with flowers in the center,
and fluted pieces for the sides & top
Here's what we found... not exact, but pretty close!


It's on the schedule to be completed by 9/2... we'll see!

Lots of progress with tiling over the weekend.  Photos soon!

Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Tar paper & Wallboard installation 
Photos of progress- 7/23
Picking the flooring

Photos of progress- 7/27

Friday, July 27, 2012

Bathroom Update- July 27

I wasn't going to post an update until next week, but I'm excited that we're running about 1-2 weeks ahead (that's a first!)


Tile supplies are ready, and we've begun laying out the first part on the floor in the hall.





This weekend we hope to finish up the spackling and start the tiling!  We gave ourselves until 8/12 to get that done, which still might be accurate- since we've never tiled before.

*please excuse the poor photos-
I just snapped a few quick pics with my phone!
 

















So, here's where the To Do List stands heading into the weekend...


By July 15th:
Purchase wainscoting, drywall & wall board Complete!
Purchase sink/vanity & toilet Complete!
Purchase new light/fan, white outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes
  Complete! 
Complete install of vent pipe in bathroom & attic
  Complete! 


By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!

Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor   Complete! 
Level joists  Complete!  
Install new sub-floor  Not Needed!
Take down mirror  Complete! 
Install drywall to walls  Complete! 


By August 5th:
Purchase tile, grout & supplies
 Complete!   
Purchase sink fixtures Complete!  
Purchase molding pieces  Complete!  
Tape joints 
  Complete!  
Spackle & sand- almost done!

By August 12th:
Purchase wood flooring- Ordered!

Borrow tile cutter
Purchase paint & painting supplies 
Install tile around shower/tub
Install shower/tub fixtures

By September 2nd:
Paint wainscoting pieces
Install wood floor
Install door & window molding
Install wainscoting
Install toe moldings

By September 9th:
Paint walls & moldings
Install shower curtain rod

Install new fan/light

By September 23rd:
Purchase Mirror
Install vanity
Install sink & tub fixtures
Install toilet
Install light fixtures
Install face plates

By October 1st:
Install drywall to foyer ceiling & walls
Finishing touches & decorating in bathroom


Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Tar paper & Wallboard installation
Photos of progress- 7/23
Picking the flooring

Wednesday, July 25, 2012

Bathroom Flooring Decision

We decided we wanted wood for the bathroom floor, so did a ton of research on whether this was a "smart" choice- given the moisture factor.  We also went and picked up two samples of our top choices at Lowe's.
On the left is the manufactured wood, on the right is solid hardwood.




There are several issues we had to weigh, here's how they stacked up!
1.Thickness of the new flooring.  
Here's they are placed where the flooring will meet the hall floor-->
We are okay with having a door saddle, but don't want there to be a huge difference in height from the hallway flooring.  Thinner is better.
Winner: Manufactured


2. Durability
Is it going to hold up to splashes of water? (We'll have a bathmat, so hopefully shouldn't be TOO much water!)  
Winner: Manufactured
This one really shocked me!  Apparently, the manufactured handles moisture better, and is less likely to warp than solid wood. Who knew?


3. Longevity 
Will we be able to sand it and re-stain it in the future?  Would be nice!
Winner: Hard Wood

The Manufactured can not be sanded down.


4. Ease of Installation 
We're doing this ourselves.  
Hard wood requires nailing, while the Manufactured is "floating" and just snaps together (I'm sure still easier said than done!)
Winner: Manufactured


5. Cost
The manufactured costs less than the hard wood, and doesn't need any tool rentals.
Winner: Manufactured


So, we're going with the Manufactured! 

Although it doesn't have the longevity, we'll likely decide to go with something completely different in 10 years! 
The ease & price make it the right choice for us this time around.


 It's ordered (ahead of schedule!) and should arrive next week. 

Monday, July 23, 2012

Photos of the Bathroom Progress

I hadn't gotten around to taking photos of everything for Friday's To Do List update, so here are some pics  & details!

We've replaced all of the grungy looking tan outlets/switches with new white ones.
They all worked just fine, but since they'll be right next to the white wainscoting, I wanted them to match.
I forgot to take "before" shots, but here are the afters:


<---I feel like the outlet on the left is upside down.  Clearly doesn't matter, but Mike said he'll flip it for me.  What a great hubby!




This is looking up to the ceiling light/fan. 
We completed the venting. 
It was originally installed to blow right into a beam in the attic floor- no wonder it didn't work!
We still have to install the actual fixture once the spackling is done.










I've spent lots of time scraping the caulking away 
from where the old shower doors were installed.


Putty knife, razor blade, cleaner... little by little it's coming up, but there's still a mark.  Ugh!  More elbow grease needed!




The mirror has come down- happily, we got it out without breaking it!
We also took down the light fixture for now. It's coming back, but we need it out of the way for spackling.

Mike finished the areas that needed to be re-sheetrocked on Friday, and spackling has started (a week ahead of schedule- yay!)  


As for downstairs, the new electrical cable is bundled up with the existing, as are the new Pex lines.  We'll be closing that wall back up soon.


In the family room, we no longer have the stack running all the way down to the floor, but the plumbing had to drop lower than the ceiling to connect to the new stack.
We have a few creative ideas on how to close all this back up, without it being noticeable.




Friday, July 20, 2012

Bathroom To Do List- 7/20 Update

Trying to stay on track... below is our updated list.
We were able to get everything except the new fan/light installed by our self-imposed 7/15 deadline and we're on track for the 7/22 deadline.


I'm a little worried about the spackle/sanding and the tile- those will likely take us longer than expected... so I'll be happy if we can get a head start on them!


By July 15th:
Purchase wainscoting, drywall & wall board Complete! 
Purchase sink/vanity & toilet Complete!
Purchase new light/fan, white outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes
 Complete! 
Install new fan/light
Complete install of vent pipe in bathroom & attic
 Complete! 

By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!

This mirror is gone!
New pictures soon!
Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor   Complete! 
Level joists  Complete!  
Install new sub-floor  Not Needed!
Take down mirror  Complete! 
Install drywall to walls -Mike's working on today!

By August 5th:
Purchase tile, grout & supplies
Purchase sink fixtures Complete!  
Purchase molding pieces  Complete!  
Tape joints

Spackle & sand

By August 12th:
Purchase wood flooring
Install tile around shower/tub
Install shower/tub fixtures

By September 2nd:
Paint wainscoting pieces
Install wood floor
Install door & window molding
Install wainscoting
Install toe moldings

By September 9th:
Paint walls & moldings
Install shower curtain rod

By September 23rd:
Purchase Mirror
Install vanity
Install sink & tub fixtures
Install toilet
Install light fixtures
Install face plates

By October 1st:
Install drywall to foyer ceiling & walls 
Finishing touches & decorating in bathroom


Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Tar paper & Wallboard installation

Wednesday, July 18, 2012

Bathroom- Tar Paper & Wallboard

The bathroom is moving along... 
We had ripped out all the old shower walls which exposed the original boards, cut in the rough shape of the tree... LOVED seeing that!


Mike then replaced the plumbing that runs to the tub fixtures, since it was now open and easier to get at.




For the next step, Mike relied on this video as a guide: 
http://www.youtube.com/watch?v=QyaSjgw2hf4





In the video they suggest using tar-like roofing material to waterproof the tub/shower.  So that's what we used.  They made it seem so easy & clean.  
We got the stuff all over the place!  

<-- Here we are with the tar paper on, and starting the wall board.




One more thing we should mention... 
Make sure your supporting stucture for the wallboard is adequately spaced.  
Mike had to take down the section of wall board along the top, and peel back the tar paper to add a backer strip since it didn't feel sturdy enough screwing it into just one backer strip.  We didn't want to risk leaving it and then the tiles cracking.



The other tricky part was making the holes for the fixtures in the wallboard.  We put toothpaste on the end of each fixture and held the wallboard up against it, to get accurate placement before we drilled the holes.

So, now this area is just about ready for tile.  
Since this is another first for us, we'd better start looking up videos on how to do that!







Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Monday, July 16, 2012

Cushions for the yard

A few weeks ago, the boys got me a sewing machine for my birthday!
I am so excited to try all those sewing projects I pinned- but a little intimidated...


For my first project, I decided to make cushion covers for some of the outside wicker furniture- a love seat & chair that my mom picked up at a yard sale last year.  We thought it would make a cute little conversation area somewhere in the yard, but I wasn't crazy about the '80s floral print on the cushions.

Here's the before:

And here's the after:

The material has a think canvas-y feel.  It was only $3/yard at Walmart.
I like the tan, cranberry, salmon, black & green stripes- they kind of go with the colors of the house (without being too matchy-matchy)







I even did a little Velcro along the back, so I can remove & wash as needed.

I made the black pillow with some extra material I had laying around & added a little embellishments (a flower made from the scrap material from the cushion covers & some ribbon).
Mike thought our son made it... so maybe it isn't as cute as I thought! Ha Ha!

They're definitely not perfect, but not too bad for my first try at sewing!

Friday, July 13, 2012

Bathroom Timeline

Mike said we would have the bathroom done by the end of the summer.  I thought that was way too long to wait, so decided to map out the "To Do List" with the time we'll have available to work on it (after work & on weekends around the kids' activities).

And the ending date is... October 1- Booo!!!!
And that's if everything goes smoothly (which it NEVER does!)

So with our expectations adjusted, here's the To Do List on a timeline, to keep us on track.
We gave a little bit of cushion- knowing that we have to figure some of this out by trial & error.
Hopefully there will be some overlap and we've allotted enough time!

We're doing pretty well so far (Knock on wood!)

By July 15th:
Purchase wainscoting, drywall & wall board Complete!
Purchase sink/vanity & toilet Complete!
Purchase new light/fan, white outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes
Connect electric to fan/light
Complete install of vent pipe in bathroom & attic

By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!
Waterproofing & wall board installed
ahead of schedule!
Will post details soon...
Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor
Level joists
Install new sub-floor
Install drywall to walls

By August 5th:
Purchase tile
Purchase sink fixtures
Purchase molding pieces
Tape joints
Spackle & sand

By August 12th:
Purchase wood flooring
Install tile around shower/tub
Install shower/tub fixtures

By September 2nd:
Paint wainscoting pieces
Install wood floor
Install door & window molding
Install wainscoting
Install toe moldings

By September 9th:
Paint walls & moldings
Install shower curtain rod

By September 23rd:
Purchase Mirror
Install vanity
Install sink & tub fixtures
Install toilet
Install light fixtures
Install face plates

By October 1st:
Install drywall to foyer ceiling & walls
Finishing touches & decorating in bathroom



Wednesday, July 11, 2012

Bomb Shelter

Now that I've covered the reason for buying a new sump pump, I can get to the more exciting project...
We've pumped out the bomb shelter!

Here's how it looked when we did the house inspection:
Filled to the top with water!  So we closed it up, put some massively heavy rocks on top, and I continued to have nightmares about a kid falling in there.

After we saw there wasn't water coming over the top of the well hole, we decided to check out the bomb shelter again- maybe the flooding went down with the water table?

 No such luck!
But now we had a sump pump handy, and we decided to try to drain it.

After several hours, it was down a couple of feet --->

The next day, it was down to about 6 inches (at which point the float on the pump turned it off)  Good thing we have Wellies!

The entrance ladder was no longer there, so we used one of Mike's to check it out.



Mike went first, then I took a turn.
It was feeling pretty creepy as I descended the ladder!
SO dark- even with the flashlight.



It looks much less frightening in the photos!

The first thing Mike pulled up (right at the bottom of the ladder) was a cooking pot with a handle.
This got me all excited that there would be cool stuff inside!  But the ONLY other item in there was a ladder, in the middle of the room!
So, backing up... at the bottom of the ladder there's a doorway to the right.  You're then standing in this room.  I'd guess it's approximately 12'x12'.

Here's a photo taken from next to the ladder:
The entrance/exit is that doorway on the left.  The doorway on the right is a little closet (around 3'x2')

It looks like someone was in the process of patching the ceiling (my guess is due to leaking!)

It's kind of neat that the ladder was still standing there, and to think of the space completely filled with water all that time.
When we asked the previous owner about it, she said that an earlier owner of the house sold bomb shelters. We can see the lid of the shelter in the aerial photo that was taken in 1954, so it must have been before then.
I was hoping to find old cans of food from the 1950's- or something that told a story!  So this was kind of a let-down.  It felt a bit like when Geraldo opened Al Capone's safe in 1986.  At least we weren't on live TV!

Now the big question is whether it's going to fill back up...
Was the leak near the top, and once the water got in, it had no place to go?
Or will it slowly refill from the bottom?
Would installing a permanent sump pump do the trick?
I don't think I'd be willing to store anything in here, just because of the flooding risk.
But what COULD we do with it?  Gotta think about that some more!


Here are additional photos that I took:

Pipe that has a valve on it.



Two small pipes that come into the ceiling
Another pipe (ventilation)  

You can see where the bigger pipes come up through the grass.

They were our first clue that the bomb shelter was even there, since the lid was covered with a canoe when we first looked at the house!

I'll have to search the ground for those two smaller pipes.  They should be over near the workshop.  I wonder if they were for electric?  That seems silly- if there was ever a bomb/disaster... but who knows!

I'll eventually research to see if I can find out what company the owner that installed it worked for- maybe there are old building plans or something.