Well, not really... but I thought it sounded better than "Raising the Ceiling"!
So, now that you know the
plan for exposed beams in the future media room... that got Mike thinking. And that got him ripping...
He was off from work one day, and I came home to find the ceiling of the third floor hallway ripped down! I was a little upset with him- but only because he didn't take before or during photos. So, I'll do my best with "before" photos being from the light fixture getting installed (yep- that newly installed fixture had to come back down!)
 |
| BEFORE |
 |
| AFTER |
 |
| BEFORE |
 |
| AFTER |
I thought the idea itself is fantastic! This will make that low ceiling hallway feel much more open! But it's definitely in the "looking worse before it can look better" stage.
 |
From hallway, looking toward unfinished
storage area |
Mike has built support beams/framing so that we can sheetrock up to the roof peak & enclose the new media room.
He had to do the same thing on the other side, to extend the wall seperating the unfinished storage area from the hallway.
Here he also needed to put up plywood so that the spray foam insulation has something to stick to.
Mike also has been doing this under the eaves, where the unfinished section will meet the finished section's storage area (for insulation purposes).

Of course, we're running into little unexpected issues... like the fact that the molding medallions were cut in half where they met the old ceiling (we were hoping they'd be whole underneath the plaster!)
We'll need to come up with a better solution there!
Also, there's the electric wire that runs down the stairs for the light switch... It was fine when the ceiling was much lower, but now we need to run it up higher, and it's about 3 inches too short! Grrr... just 3 inches!!!