We started working on the moldings in the media room.
Here's the list of what needs to be done...
-Two "closet" doorways (to access the storage areas under the eaves)
-Two windows
-3 Door frames (inside the room & in the hallway for each)
-cap molding around the chimney (to make transition from plaster to brick)
-Entire room base moldings- but we can't do this until the floor has been installed.
We made a big list of all the measurements, and headed to Home Depot to get our supplies.
We were able to find most of the boards we needed pre-primed (yay for saving a step!)
The first thing we tackled were the closet doorways.
Since almost the entire house has the block corners and fluted side/top boards... there's no need for mitered corners, so it was a fairly straight forward.
| BEFORE |
First, Mike trimmed out the inside of the opening.
(I missed taking a photo of that step! But you can see the finished boards in the photos below)
(I missed taking a photo of that step! But you can see the finished boards in the photos below)
| We stacked up boards to figure out where the bottom of the moulding should be, once the floor is installed. Then cut the boards to fit. |
| The very bottom boards will be installed after the flooring & base boards are in. |
| Lots of little nail holes & joints to fill with wood putty, then painting these can begin! |
I'm currently hunting for closet doors...
Next up... window molding!
