Here's where we now stand with the electrical work that's been done in Attic...
All wiring has been run...
5 outlets have been installed, including the one that will be behind the wall...
The behind the wall outlet will be so that the TV can hang on the wall, and the wires will snake through a box, and plug in back there. This way the wires & plugs won't show :)
The ceiling light/fan box and pendant light boxes have been installed:
Wiring is prepped for the lights under eaves (where storage areas will be)...
The exisiting junction box has been replaced with a much cleaner & safer solution...
A light switch is installed for the ceiling fan & pendant lights. It now runs to a temporary work light that they put in for us...
The remainder of the electrical work in here will be completed when the sheetrock has been installed.
But that's still a ways off... we will have to do the insulation before that can happen.
Our next step for the attic is putting down the subfloor.
Related posts:
The Electric Plan
The Upstairs & Attic Hallway Electric
The Master Bedroom Electric
The exisiting junction box has been replaced with a much cleaner & safer solution...
BEFORE- BAD |
AFTER- GOOD! |
Another piece of after- GOOD! |
A light switch is installed for the ceiling fan & pendant lights. It now runs to a temporary work light that they put in for us...
BEFORE |
AFTER |
The remainder of the electrical work in here will be completed when the sheetrock has been installed.
But that's still a ways off... we will have to do the insulation before that can happen.
Our next step for the attic is putting down the subfloor.
Related posts:
The Electric Plan
The Upstairs & Attic Hallway Electric
The Master Bedroom Electric
No comments:
Post a Comment