Tuesday, August 7, 2012

Bathroom Update- 8/7/12

After a busy weekend, here's a quick update to our "To Do List".
The grouting is complete, but we still have to do the sealer.
The room looks much like it did last week... so I didn't take new photos.



The only difference is that now it's covered in a layer of dust, since we're also finishing up sanding the spackled areas.





Other progress:
Mike set out all of the wainscoting boards in the workshop.  I hope to prime them this week.  They'll be going behind the radiator, toilet & vanity, so we're painting them ahead of installation, knowing we'll have to do touch up.

By July 15th:
Purchase wainscoting, drywall & wall board Complete!
Purchase sink/vanity & toilet Complete!
Purchase new light/fanwhite outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes
  Complete! 
Complete install of vent pipe in bathroom & attic
  Complete! 


By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!

Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor   Complete! 
Level joists  Complete!  
Install new sub-floor  Not Needed!
Take down mirror  Complete! 
Install drywall to walls  Complete! 

By August 5th:
Purchase tile, grout & supplies
  Complete!   
Purchase sink fixtures Complete!  
Purchase molding pieces  Complete!  
Tape joints 
   Complete!  
Spackle & sand- ALMOST done!

By August 12th:
Purchase wood flooring-
  Complete!
Borrow tile cutter Complete!
Install tile around shower/tub Complete! (just need to seal the grout!)  
Purchase paint & painting supplies 
Install shower/tub fixtures

By September 2nd:
Paint wainscoting pieces- getting started with the primer this week
Install wood floor
Install door & window molding
Install wainscoting
Install toe moldings

By September 9th:
Paint walls & moldings
Install shower curtain rod

Install new fan/light

By September 23rd:
Purchase Mirror
Install vanity
Install sink & tub fixtures
Install toilet
Install light fixtures
Install face plates

By October 1st:
Install drywall to foyer ceiling & walls
Finishing touches & decorating in bathroom


Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Tar paper & Wallboard installation
Photos of progress- 7/23
Picking the flooring
Bathroom tile