Bathroom Update- 8/15/12
Moving right along in the bathroom...
 |
In Progress |
This past week the grouting has been completed, we've installed the shower fixtures, started installing the wainscoting and moldings, and started installing the wood floor.
Speaking of the wood floor- we totally lucked out this past weekend. Realizing we were going to need one more box of flooring, we headed to Lowe's to order it. We were kind of bummed since this would slow us down (last time it took about a week to come in).
However, when we got there, one box was in stock- and to top it off, it was marked down $15 because it was a return!!! Woo-Hoo!
This is my favorite view- very white since we haven't painted the walls yet... but if you squint, it could look almost done!
Here's the updated To Do list:
By July 15th:
Purchase wainscoting, drywall & wall board Complete!
Purchase sink/vanity & toilet Complete!
Purchase new light/fan, white outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes Complete!
Complete install of vent pipe in bathroom & attic Complete!
By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!
Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor Complete!
Level joists Complete!
Install new sub-floor Not Needed!
Take down mirror Complete!
Install drywall to walls - Complete!
By August 5th:
Purchase tile, grout & supplies Complete!
Purchase sink fixtures Complete!
Purchase molding pieces Complete!
Tape joints Complete!
Spackle & sand
Complete!
By August 12th:
Purchase wood flooring- Complete!
Borrow tile cutter Complete!
Install tile around shower/tub Complete!
Purchase paint/supplies
Complete!
Install shower/tub fixtures Complete!
By September 2nd:
Paint wainscoting pieces- Primed!
Install wood floor- In progress!
Install door & window molding
- In progress!
Install wainscoting
- In progress!
Install toe moldings
Install crown molding (added)
By September 9th:
Paint walls & moldings
Install shower curtain rod
Install new fan/light
By September 23rd:
Purchase Mirror
Install vanity
Install sink fixtures
Install toilet
Install light fixtures
Install face plates
By October 1st:
Install drywall to foyer ceiling & walls
Finishing touches & decorating in bathroom
Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping
Tar paper & Wallboard installation
Photos of progress- 7/23
Picking the flooring
Bathroom tile
8/7 Update
This bathroom just keeps getting better and better! I love your checklist/timeline and seeing how much you have accomplished. Almost there!!
ReplyDeleteThanks so much Lynn! Trying to keep myself motivated :)
Delete