Wednesday, August 15, 2012

Bathroom Update- 8/15/12

Moving right along in the bathroom... 
In Progress
This past week the grouting has been completed, we've installed the shower fixtures, started installing the wainscoting and moldings, and started installing the wood floor.  

Speaking of the wood floor- we totally lucked out this past weekend.  Realizing we were going to need one more box of flooring, we headed to Lowe's to order it.  We were kind of bummed since this would slow us down (last time it took about a week to come in).  
However, when we got there, one box was in stock- and to top it off, it was marked down $15 because it was a return!!!  Woo-Hoo!



This is my favorite view- very white since we haven't painted the walls yet... but if you squint, it could look almost done!



Here's the updated To Do list:

By July 15th:
Purchase wainscoting, drywall & wall board Complete!
Purchase sink/vanity & toilet Complete!
Purchase new light/fanwhite outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes
  Complete!
Complete install of vent pipe in bathroom & attic  Complete! 


By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!

Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor   Complete! 
Level joists  Complete!  
Install new sub-floor  Not Needed!
Take down mirror  Complete! 
Install drywall to walls  Complete! 

By August 5th:
Purchase tile, grout & supplies
  Complete!   
Purchase sink fixtures Complete!  
Purchase molding pieces  Complete!  
Tape joints 
   Complete!  
Spackle & sand  Complete!   

By August 12th:
Purchase wood flooring-
  Complete!
Borrow tile cutter Complete!
Install tile around shower/tub Complete!  
Purchase paint/supplies  Complete!   
Install shower/tub fixtures Complete! 









By September 2nd:
Paint wainscoting pieces- Primed!
Install wood floor- In progress!




Install door & window molding In progress! 
Install w
ainscoting In progress!  
Install toe moldings
Install crown molding (added)

By September 9th:
Paint walls & moldings
Install shower curtain rod

Install new fan/light

By September 23rd:
Purchase Mirror
Install vanity
Install sink
 fixtures
Install toilet
Install light fixtures
Install face plates

By October 1st:
Install drywall to foyer ceiling & walls
Finishing touches & decorating in bathroom


Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Tar paper & Wallboard installation
Photos of progress- 7/23
Picking the flooring
Bathroom tile
8/7 Update