Master Closet

With the painting of the master closet completed...
...they  began installing the heating.

 While that was underway, we ran out and bought the shelving units.

I was planning on getting the pedestal bases and having them sit on the floor.  But then we thought that wouldn't be the best idea with the heating, so we ended up hanging them- a little more work, but now there's storage underneath as well!

Left side of closet

Right side of closet:



Of course, our set up wasn't the same as the "kit", so we had a lot of cutting and customizing to do. Plus, there weren't studs where we needed them, so that took a bit of extra work. It took about 10 hours for assembly and hanging.