After the MANY days of sheetrock/spackle posts, I'm scared to even label the tiling posts by days.
I don't know if it's that we've been conditioned by all the half hour TV renovation shows to think that these things happen more quickly than they really do... or if these guys are, in fact, really slow. Maybe a bit of both!
Anyway, I think I'll try to consolidate the posts a bit- since I'm over a week behind with posting the progress, I'll tell you it isn't going as quickly as I'd like.
The first day that the tiler was here, he got all of his gear set up in the master bedroom (still empty from tearing down the ceiling).
Then over the next two days he got started with the shower tray & mudding...
I should also add here that we asked our contractor to add a little shower shelf for shampoo bottles:
As the shower tray was setting, he moved on to "mudding" the rest of the floor:
On day 3 of tile prep, the plumber finally showed up. After double checking the tub he decided that he needed to move the drain pipe out from the wall a bit... which, of course, is better to do now than after the tiling has been done.