The rough electrical inspection was passed a few weeks ago, and then we had the rough plumbing inspected two weeks ago, and it passed as well.
Mike filled in the trench, so we have a little bit of normalcy on that side of the house!
The framing inspection was done last Monday, however there were a number of little things that still needed to be completed (like fire caulking where the wires run through the framing in between the floors). Our contractor took care of those thing and the re-inspection was last Thursday... we passed!
The contractor did a few other odds & ends during all this... the subfloor of the laundry room needed an extra layer of plywood so that it will be even with the hallway flooring once the tile is put down.
He also needs to frame out this door way- the opening is currently larger than needs to be, however we need to make sure it will be wide enough that we can get the washer & dryer in and out of there. The doorway in our bedroom that goes to the master bath also needs to be framed out- he's left it intact for as long as possible to contain the mess.
Next up- insulation!

No comments: