From the kitchen, you can see the plumbing work that goes up to the master bathroom.
In the downstairs half bath, it looked like the hole for the toilet was placed too close to the sink fixtures. We already have the vanity & toilet, so we brought them in o check the placement of the plumbing...
They had to move the hole a few inches to the left so that there would be enough room for both pieces.
Master Bath plumbing isn't as far along... they ran the pipes to the second floor but needed to check the shower & tub fixtures and placement of them with us.
The laundry room is looking great...
For the new drain pipe to connect to the septic system, they were going to run it through the basement. But the pitch that was needed meant that it would cut right through the middle of the "room" and we'd have to be ducking under it. We don't plan to have much down in the basement, but we still weren't crazy about the sound of this. Mike talked to the plumber and they decided they could connect outside, but it required a trench to be dug and a bunch of our forsythia bushes to be moved... but we are happy with this solution!
They have a few odds & ends that need to be finished up before the plumbing inspection can take place. It was supposed to happen Thursday... delays, delays :(
Good news is that the inspector did the rough electrical inspection on Thursday and we passed!
Once the plumbing gets done they can inspect that and the framing. Once we pass that, they can start working on the exterior siding & interior insulation!