You know, I think we jinxed ourselves posting about the
last two plumbing fixes- and how relatively quickly & easily they went. Get ready for some more ugly basement photos!
 |
I missed taking a pic of the old pipe
before Mike removed it,but you can see the wet beam! |
On Sunday morning, Mike went down into the basement & found a trickle of water running across the floor.
After a little investigating, we found a pinhole in some copper piping, that was shooting a very fine mist onto the adjacent beam and dripping to the floor.
Luckily, Mike's gotten quite good a fixing copper piping.
 |
| The patches on the old pipe. |
He assessed the rest of the pipe, which had two sections that had been patched by the previous owner.
Figuring it was just a matter of time until there were more issues with it, he decided to replace the whole length (approx. 20 feet).
I thought all was going rather smoothly (Yup- jinxed again)
 |
| The new "T" connector all finished! |
Mike got to the "T" where it joins with the rest of the system.
The old pipe just WOULDN'T come out.
We had enough pipe to cut and re-do that section too, but didn't have an extra "T" connector... back to Lowe's.
Well, we're back up and running.
I'm really hoping this is my last plumbing post for a while (knock on wood!)
PS- While all of this was going on, I did manage to take photos of the master bedroom.
I will have those
posted in the next day or two!