Friday, July 27, 2012

Bathroom Update- July 27

I wasn't going to post an update until next week, but I'm excited that we're running about 1-2 weeks ahead (that's a first!)


Tile supplies are ready, and we've begun laying out the first part on the floor in the hall.





This weekend we hope to finish up the spackling and start the tiling!  We gave ourselves until 8/12 to get that done, which still might be accurate- since we've never tiled before.

*please excuse the poor photos-
I just snapped a few quick pics with my phone!
 

















So, here's where the To Do List stands heading into the weekend...


By July 15th:
Purchase wainscoting, drywall & wall board Complete!
Purchase sink/vanity & toilet Complete!
Purchase new light/fan, white outlets & switches Complete!
Run electric from basement to attic (prep for finishing attic rooms) Complete!
Secure pex & wire to inside foyer wall (had run out of brackets) Complete!
Complete PVC caps on old pipes in basement Complete!
Finish stack in the foyer & insulate heating pipes
  Complete! 
Complete install of vent pipe in bathroom & attic
  Complete! 


By July 22nd:
Purchase shower/tub fixtures, shower curtain rod Complete!
Tar paper & waterproof shower/tub Complete!

Install wall board to shower/tub Complete!
Install new outlets & light switches Complete!
Rip out old vinyl floor   Complete! 
Level joists  Complete!  
Install new sub-floor  Not Needed!
Take down mirror  Complete! 
Install drywall to walls  Complete! 


By August 5th:
Purchase tile, grout & supplies
 Complete!   
Purchase sink fixtures Complete!  
Purchase molding pieces  Complete!  
Tape joints 
  Complete!  
Spackle & sand- almost done!

By August 12th:
Purchase wood flooring- Ordered!

Borrow tile cutter
Purchase paint & painting supplies 
Install tile around shower/tub
Install shower/tub fixtures

By September 2nd:
Paint wainscoting pieces
Install wood floor
Install door & window molding
Install wainscoting
Install toe moldings

By September 9th:
Paint walls & moldings
Install shower curtain rod

Install new fan/light

By September 23rd:
Purchase Mirror
Install vanity
Install sink & tub fixtures
Install toilet
Install light fixtures
Install face plates

By October 1st:
Install drywall to foyer ceiling & walls
Finishing touches & decorating in bathroom


Related posts:
Before pics
Project Timeline
Bathroom Demo
Bathroom Shopping

Tar paper & Wallboard installation
Photos of progress- 7/23
Picking the flooring

No comments:

Post a Comment